Sizzler Remodel

The Sizzler in Yuba City was due for a makeover. Hilbers, Inc. asked us to price out the rough framing for them and we were awarded the job in mid November. This was another fast track project. There was a considerable amount of work to be done both on the exterior and interior of the building.

(more…)

Tower Market #120

Tower Market #120 was an interior remodel project located in West Sacramento. We bid this project to Hilbers, Inc. in late October of 2011. We were awarded the rough framing in early November with a start date around the same time. This was to be a fast track project and our work was to be completed in two days — we committed to do it in one.

(more…)

Bunkhouse

Looks like my last post was in late October, so let’s catch up a bit. We have done work for this project Owner dating back to 2002. The Bunkhouse project is a 2,600 square foot residential building. The concept for the Bunkhouse was started back in early June. After finalizing the design concept with the Owner, we began drawing up plans to obtain a building permit. Russell Gallaway Associates, Inc. provided the structural engineering. We were issued a building permit in mid October.

(more…)

Powered by WordPress